Service » Energy Conservation
News
With more than 15 years research on Energy Conservation and Process Integration based on Pinch Technology concepts, in accordance with global need to conserve energy, Petro Hitech Kish can cover the following:
  • Design of Heat Exchanger Networks (HEN) through the Grassroots design of the Plants.
  • Design of Heat Exchanger Networks (HEN) through the Retrofit Studies of the Plants, either in ‘Retrofits for Energy Saving’ or ‘Retrofits for Debottlenecking’
  • Full Coverage of Pressure Drop Consideration and Optimization through Maximum Energy Recovery (MER) studies
  • Efficiency improvement of Combustion Equipment like Boilers and Furnaces through:
    • Heat Recovery from the flue gases by Air Preheaters, Economizers, and Waste Heat Boiler, and etc.
    • Improved Combustion Control
  • Total heat train optimization within given operation & space constraints
  • Low Level Heat Utilization
  • Flare Gas Recovery
  • Vapor Recovery
Petro Hitech Kish have been audited according to ISO 9001:2008 and recently qualified for the extention of his certificate.
Detail Design Engineering & Project Management of 7,500 BPD Setareh Khorasan Petrochemical & Refinery Complex have been awarded to Petro Hitech Kish Company.
Contact Us
Address: No.21, Arafaty St, Dibaji exit, Sadr highway, Tehran / Iran.
Tel:  (+98-21) 22541704, 22541778, 22598298, 22589645, 22589784
Fax:  (+98-21) 22780530
Email: info@petrohitech.ir
Website: www.petrohitech.ir

Second Office:
Address:
 #5, 11th floor, Nahid Tower, Shah nazary St., Mohseni Sq., Tehran, Iran
Tel:  (+98-21) 22275347, 22275345
Fax:  (+98-21) 22275334